Supply of new build 650T capacity auxiliary reel

When you require new build cable and pipe lay equipment you need experts that can design and manufacture equipment that is fit for purpose.

Benefits

  • Engineering support to ensure the equipment was fit for purpose
  • Delivery of equipment on a short time scale
  • Technical support to ensure correct installation.

Challenge

When you require new build cable and pipe lay equipment you need experts that can design and manufacture equipment that is fit for purpose.

Our client required to install an existing lay spread to a brand new vessel and they contracted us to supply and install a new 650T capacity auxiliary reel.

Solution

  • The reel incorporated a new support and drive system in order to accommodate flexible pipes ranging between 3” and 8” in diameter
  • After manufacture the reel was shipped to a ship yard in Finland for installation upon the clients vessel and commissioning and sea trials took place in Scotland at Invergordon and Evanton.

Summary

  • Project management
  • Design
  • Procurement
  • Management of fabrication
  • Audit reporting
  • Commissioning
  • Supply of offshore personnel.